Share 12th & Walnut St. Drainage Improvements on FacebookShare 12th & Walnut St. Drainage Improvements on TwitterShare 12th & Walnut St. Drainage Improvements on LinkedinEmail 12th & Walnut St. Drainage Improvements link
This project for 12th St. and Walnut St. will include installing a new 30-inch storm line along 12th St. to help reduce flooding during heavy rainstorms. This new storm line will improve the area’s ability to handle rainwater, preventing it from pooling on the streets and causing potential damage to properties or making travel dangerous.
In addition to installing the new storm line, the project will involve other drainage improvements to ensure water flows more efficiently through the area. By upgrading the drainage system, the town aims to reduce the risk of flooding in the future and improve the overall safety and reliability of the streets during rain events. These improvements will make the area safer for drivers, pedestrians and homeowners, especially during storms or periods of heavy rainfall.
This project for 12th St. and Walnut St. will include installing a new 30-inch storm line along 12th St. to help reduce flooding during heavy rainstorms. This new storm line will improve the area’s ability to handle rainwater, preventing it from pooling on the streets and causing potential damage to properties or making travel dangerous.
In addition to installing the new storm line, the project will involve other drainage improvements to ensure water flows more efficiently through the area. By upgrading the drainage system, the town aims to reduce the risk of flooding in the future and improve the overall safety and reliability of the streets during rain events. These improvements will make the area safer for drivers, pedestrians and homeowners, especially during storms or periods of heavy rainfall.
Share WATER SHUTOFF ALERT: Walnut and 12th St., between Parkwood and Trailwood Dr. on FacebookShare WATER SHUTOFF ALERT: Walnut and 12th St., between Parkwood and Trailwood Dr. on TwitterShare WATER SHUTOFF ALERT: Walnut and 12th St., between Parkwood and Trailwood Dr. on LinkedinEmail WATER SHUTOFF ALERT: Walnut and 12th St., between Parkwood and Trailwood Dr. link
WATER SHUTOFF ALERT: Due to scheduled utility work on Walnut and 12th St., between Parkwood and Trailwood Dr., there will be a planned water shutoff Monday, Feb. 23 from 8 a.m. to 5 p.m.
A contractor will be replacing two aging water mainline valves in the area. Work will continue until repairs are complete to ensure the system is safely restored.
We appreciate your patience during this necessary infrastructure improvement. All work is weather-dependent and subject to change.
WATER SHUTOFF ALERT: Due to scheduled utility work on Walnut and 12th St., between Parkwood and Trailwood Dr., there will be a planned water shutoff Monday, Feb. 23 from 8 a.m. to 5 p.m.
A contractor will be replacing two aging water mainline valves in the area. Work will continue until repairs are complete to ensure the system is safely restored.
We appreciate your patience during this necessary infrastructure improvement. All work is weather-dependent and subject to change.
Share Project Update: December 12 on FacebookShare Project Update: December 12 on TwitterShare Project Update: December 12 on LinkedinEmail Project Update: December 12 link
Starting next week, crews will begin preparation work for the 12th Street Drainage Project, an important improvement designed to help reduce flooding during heavy rainstorms.
This new storm line will allow water to flow more efficiently into the detention pond. Expect some delays and single-lane shifts as crews move materials through the work zone along 12th St. from Westwood Dr. to Walnut St.
Drivers are advised to watch for workers, follow posted signs and exercise caution when traveling through construction zones.
All road work is weather permitting and subject to change. For traffic alert updates, text WINDSORROADS to 888777.
Starting next week, crews will begin preparation work for the 12th Street Drainage Project, an important improvement designed to help reduce flooding during heavy rainstorms.
This new storm line will allow water to flow more efficiently into the detention pond. Expect some delays and single-lane shifts as crews move materials through the work zone along 12th St. from Westwood Dr. to Walnut St.
Drivers are advised to watch for workers, follow posted signs and exercise caution when traveling through construction zones.
All road work is weather permitting and subject to change. For traffic alert updates, text WINDSORROADS to 888777.