2025 Street Maintenance Program

Share 2025 Street Maintenance Program on Facebook Share 2025 Street Maintenance Program on Twitter Share 2025 Street Maintenance Program on Linkedin Email 2025 Street Maintenance Program link

The Street Maintenance Program is a key part of the town’s Capital Improvement Plan, aimed at increasing the lifespan and renewing the condition of roads throughout the community. This program includes several important projects designed to improve and maintain the streets, ensuring they remain safe and reliable for drivers and pedestrians. Addressing different types of damage early, helps prevent more costly repairs in the future.

Crack Repair Project

A contractor will seal the existing cracks in the roadways to prevents further damage caused by moisture reaching the subgrade. Crack seal is the first step in roadway preservation and is completed on streets that are less than five years old.

Roadway Seal Project

This project applies a seal to the surface of the roadway protecting it from a variety of elements. Sealing the street protects it from further sun damage and extends the overall life of the roadway.

Concrete Improvement Project

The focus of this project will be to replace concrete sidewalks around town that is cracked, settled, crumbled or deteriorated. Additionally, accessible sidewalk ramps adjacent to the roadway that are out of compliance will be replaced.

Roadway Overlay

The roadway overlay process involves applying a new layer of asphalt over an existing road surface to repair and extend its lifespan.

The Street Maintenance Program is a key part of the town’s Capital Improvement Plan, aimed at increasing the lifespan and renewing the condition of roads throughout the community. This program includes several important projects designed to improve and maintain the streets, ensuring they remain safe and reliable for drivers and pedestrians. Addressing different types of damage early, helps prevent more costly repairs in the future.

Crack Repair Project

A contractor will seal the existing cracks in the roadways to prevents further damage caused by moisture reaching the subgrade. Crack seal is the first step in roadway preservation and is completed on streets that are less than five years old.

Roadway Seal Project

This project applies a seal to the surface of the roadway protecting it from a variety of elements. Sealing the street protects it from further sun damage and extends the overall life of the roadway.

Concrete Improvement Project

The focus of this project will be to replace concrete sidewalks around town that is cracked, settled, crumbled or deteriorated. Additionally, accessible sidewalk ramps adjacent to the roadway that are out of compliance will be replaced.

Roadway Overlay

The roadway overlay process involves applying a new layer of asphalt over an existing road surface to repair and extend its lifespan.

  • Project Update: March 18

    Share Project Update: March 18 on Facebook Share Project Update: March 18 on Twitter Share Project Update: March 18 on Linkedin Email Project Update: March 18 link

    Over the next few weeks, road crews will be applying crack seal in various locations throughout the community. This maintenance helps protect and extend the life of our streets.

    Expect temporary lane switches, minor traffic delays. No parking will be allowed in work zones during active maintenance but will reopen as normal following placement. All work is weather permitting.

    Text WINDSORROADS to 888777 to receive traffic alert notifications.

Page last updated: 18 Mar 2025, 01:02 PM