15th St. Waterline Repair

Share 15th St. Waterline Repair on Facebook Share 15th St. Waterline Repair on X (formerly Twitter) Share 15th St. Waterline Repair on Linkedin Email 15th St. Waterline Repair link

A major waterline located beneath 15th St., just south of Main St. (CO 392), is a critical component of the town’s core water infrastructure and has served the community reliably for decades. As with many legacy systems, aging materials and increased demand over time can impact performance and long-term durability.

Proactively replacing this waterline is an important step in strengthening the overall water system. The project will improve reliability, support consistent water pressure and enhance fire protection capabilities in the area. It will also help reduce the likelihood of unexpected breaks, minimize service disruptions and lower ongoing maintenance costs associated with aging infrastructure.

By investing in this upgrade now, the town is taking a forward-looking approach to ensure safe, efficient and dependable water service for residents, businesses and visitors; both today and as the community continues to grow.

On Thursday, May 21, the Town of Windsor held a virtual public information session for those who will be impacted by this road work, with another held on Wednesday, May 19 that can be viewed below:


As of Wednesday, August 19, the construction schedule is as follows:

A major waterline located beneath 15th St., just south of Main St. (CO 392), is a critical component of the town’s core water infrastructure and has served the community reliably for decades. As with many legacy systems, aging materials and increased demand over time can impact performance and long-term durability.

Proactively replacing this waterline is an important step in strengthening the overall water system. The project will improve reliability, support consistent water pressure and enhance fire protection capabilities in the area. It will also help reduce the likelihood of unexpected breaks, minimize service disruptions and lower ongoing maintenance costs associated with aging infrastructure.

By investing in this upgrade now, the town is taking a forward-looking approach to ensure safe, efficient and dependable water service for residents, businesses and visitors; both today and as the community continues to grow.

On Thursday, May 21, the Town of Windsor held a virtual public information session for those who will be impacted by this road work, with another held on Wednesday, May 19 that can be viewed below:


As of Wednesday, August 19, the construction schedule is as follows:

  • Project Update: Aug. 18

    Share Project Update: Aug. 18 on Facebook Share Project Update: Aug. 18 on X (formerly Twitter) Share Project Update: Aug. 18 on Linkedin Email Project Update: Aug. 18 link

    Construction is anticipated to begin the week of Monday, Aug. 24. During this time, there will be a 2-3 hour disruption of water service, expected to impact several homes and businesses. Residents directly affected by this shutoff will be notified by Friday, Aug. 21.

    A Virtual Public Meeting will be held on Wednesday, Aug. 19 at 2 p.m. to provide project information, anticipated timelines and upcoming impacts. Meeting details and access information will be shared through Project Connect and the town’s social media channels. Business owners are welcome to join the conversation at bit.ly/4uufVIX.

    For traffic alert notifications, text

    Construction is anticipated to begin the week of Monday, Aug. 24. During this time, there will be a 2-3 hour disruption of water service, expected to impact several homes and businesses. Residents directly affected by this shutoff will be notified by Friday, Aug. 21.

    A Virtual Public Meeting will be held on Wednesday, Aug. 19 at 2 p.m. to provide project information, anticipated timelines and upcoming impacts. Meeting details and access information will be shared through Project Connect and the town’s social media channels. Business owners are welcome to join the conversation at bit.ly/4uufVIX.

    For traffic alert notifications, text WINDSORROADS to 888777.

  • Project Update: July 6

    Share Project Update: July 6 on Facebook Share Project Update: July 6 on X (formerly Twitter) Share Project Update: July 6 on Linkedin Email Project Update: July 6 link

    Preparations continue for the 15th St. Waterline Replacement Project. The project was advertised for bid and contractor bids will be accepted through mid-July. Once a contractor is selected, a virtual public meeting will be scheduled before construction begins to provide residents and businesses with information about the project timeline, anticipated impacts and construction activities. Construction is anticipated to begin later this year.

    All road work is weather permitting and subject to change. To receive traffic alert notifications, text WINDSORROADS to 888777.

    Preparations continue for the 15th St. Waterline Replacement Project. The project was advertised for bid and contractor bids will be accepted through mid-July. Once a contractor is selected, a virtual public meeting will be scheduled before construction begins to provide residents and businesses with information about the project timeline, anticipated impacts and construction activities. Construction is anticipated to begin later this year.

    All road work is weather permitting and subject to change. To receive traffic alert notifications, text WINDSORROADS to 888777.

  • Project Update: May 19

    Share Project Update: May 19 on Facebook Share Project Update: May 19 on X (formerly Twitter) Share Project Update: May 19 on Linkedin Email Project Update: May 19 link

    Preparations are continuing for the 15th St. Waterline Replacement Project as the town moves closer to construction activities and expanded public outreach efforts.

    Virtual Public Meeting Thursday, May 21 at 4 p.m.

    A virtual public meeting for the project has been scheduled for Thursday, May 21 at 4 p.m. Residents and businesses will have an opportunity to learn more about upcoming construction activities, anticipated impacts and project timelines. Residents can join the meeting at https://bit.ly/15thStInfo.

    Planned Water Service Shutoffs Tuesday, May 26 and Wednesday, May 27

    As part of ongoing preparation work, planned water service shutoffs will occur on

    Preparations are continuing for the 15th St. Waterline Replacement Project as the town moves closer to construction activities and expanded public outreach efforts.

    Virtual Public Meeting Thursday, May 21 at 4 p.m.

    A virtual public meeting for the project has been scheduled for Thursday, May 21 at 4 p.m. Residents and businesses will have an opportunity to learn more about upcoming construction activities, anticipated impacts and project timelines. Residents can join the meeting at https://bit.ly/15thStInfo.

    Planned Water Service Shutoffs Tuesday, May 26 and Wednesday, May 27

    As part of ongoing preparation work, planned water service shutoffs will occur on May 26 and May 27 for select residential and commercial properties within the project area. Impacted customers will experience temporary water outages while crews complete valve testing and related work. Door hanger notifications will be distributed directly to affected properties in advance of the shutoffs to ensure residents receive adequate notice.

    Geotechnical Investigation Work

    Residents and businesses along the project corridor may also notice increased activity over the next one to two weeks as a consultant completes geotechnical investigations in preparation for construction. This work will include utility locating, traffic control setup and drilling operations throughout the corridor.

    Motorists and residents are encouraged to use caution when traveling through the area and to follow all posted traffic control signage.

    Stay updated on roadway impacts and traffic alerts by texting WINDSORROADS to 888777.