The Street Maintenance Program in Windsor is a key part of the town’s Pavement Management Program, aimed at increasing the lifespan and renewing the condition of roads throughout the community. This program includes several important projects designed to improve and maintain the streets, ensuring they remain safe and reliable for drivers and pedestrians. By addressing different types of damage early, the program helps prevent more costly repairs in the future.
Crack Repair Project:
Contractors will seal the existing cracks in the roadways to prevents further damage caused by moisture reaching the subgrade. Crack seal is the first step in roadway preservation and is completed on streets that are less than 5 years old.
Roadway Seal Project:
This process includes applying a seal to the surface of the roadway protecting it from a variety of elements. Sealing the street protects it from further sun damage and extends the overall life of the roadway.
Concrete Improvement Project:
This project replaces concrete sidewalks around town that is cracked, settled, crumbled or deteriorated. Additionally, accessible sidewalk ramps adjacent to the roadway that are out of compliance will be replaced.
Roadway Overlay:
The roadway overlay process involves applying a new layer of asphalt over an existing road surface to repair and extend its lifespan.
The Street Maintenance Program in Windsor is a key part of the town’s Pavement Management Program, aimed at increasing the lifespan and renewing the condition of roads throughout the community. This program includes several important projects designed to improve and maintain the streets, ensuring they remain safe and reliable for drivers and pedestrians. By addressing different types of damage early, the program helps prevent more costly repairs in the future.
Crack Repair Project:
Contractors will seal the existing cracks in the roadways to prevents further damage caused by moisture reaching the subgrade. Crack seal is the first step in roadway preservation and is completed on streets that are less than 5 years old.
Roadway Seal Project:
This process includes applying a seal to the surface of the roadway protecting it from a variety of elements. Sealing the street protects it from further sun damage and extends the overall life of the roadway.
Concrete Improvement Project:
This project replaces concrete sidewalks around town that is cracked, settled, crumbled or deteriorated. Additionally, accessible sidewalk ramps adjacent to the roadway that are out of compliance will be replaced.
Roadway Overlay:
The roadway overlay process involves applying a new layer of asphalt over an existing road surface to repair and extend its lifespan.